Warning: Declaration of SLB_Lightbox::_options() should be compatible with SLB_Base::_options($options_config = NULL) in /home/dekalv/public_html/apcoconstruction.com/wp-content/plugins/simple-lightbox/controller.php on line 7

Warning: Declaration of SLB_Themes::_options() should be compatible with SLB_Base::_options($options_config = NULL) in /home/dekalv/public_html/apcoconstruction.com/wp-content/plugins/simple-lightbox/includes/class.themes.php on line 9

Warning: Parameter 1 to wp_default_scripts() expected to be a reference, value given in /home/dekalv/public_html/apcoconstruction.com/wp-includes/plugin.php on line 571

Warning: Parameter 1 to wp_default_styles() expected to be a reference, value given in /home/dekalv/public_html/apcoconstruction.com/wp-includes/plugin.php on line 571
Cannery Hotel & Casino | APCO Contruction

Warning: Declaration of SLB_Content_Handlers::get() should be compatible with SLB_Base_Collection::get($args = NULL) in /home/dekalv/public_html/apcoconstruction.com/wp-content/plugins/simple-lightbox/includes/class.content_handlers.php on line 281

Cannery Hotel & Casino

This Project consisted of Construction of a new 200 room Hotel and 237,000 S.F. Casino. Work includes Sitework, Extending Water, Sewer, Electric, Gas, Telephone, Cable, Fire Hydrants to the site. Reinforced Concrete Slab on Grade Foundation, Structural Steel shell. EIFS over 16 gauge steel studs, Single Ply Roofing. New Central Plant with 4 pipe heating and cooling systems. (4) Dining Rooms w/full Kitchens, Information/Data System, Gaming Equipment, Pool Area, “The Club” Concert Entertainment Room and Landscaping along with various other features.