Warning: Declaration of SLB_Lightbox::_options() should be compatible with SLB_Base::_options($options_config = NULL) in /home/dekalv/public_html/apcoconstruction.com/wp-content/plugins/simple-lightbox/controller.php on line 7

Warning: Declaration of SLB_Themes::_options() should be compatible with SLB_Base::_options($options_config = NULL) in /home/dekalv/public_html/apcoconstruction.com/wp-content/plugins/simple-lightbox/includes/class.themes.php on line 9

Warning: Parameter 1 to wp_default_scripts() expected to be a reference, value given in /home/dekalv/public_html/apcoconstruction.com/wp-includes/plugin.php on line 571

Warning: Parameter 1 to wp_default_styles() expected to be a reference, value given in /home/dekalv/public_html/apcoconstruction.com/wp-includes/plugin.php on line 571
Grand Canyon – Skywalk | APCO Contruction

Warning: Declaration of SLB_Content_Handlers::get() should be compatible with SLB_Base_Collection::get($args = NULL) in /home/dekalv/public_html/apcoconstruction.com/wp-content/plugins/simple-lightbox/includes/class.content_handlers.php on line 281

Grand Canyon Skywalk

APCO was selected by Locsha Engineering and the Developer to build a one of a kind Walkway Structure on the Hualapai Indian Reservation. Approximately 4000 Feet from the Canyon Floor and with a projection of 70 Feet past the edge of the Canyon wall, the Bridge incorporated a glass floor to provide a view to the Canyon Floor below.  Glass Handrails enhanced the open feeling for tourists visiting the site.